The project follows problems reported in some areas of the old network, including changes in water color and unusual odors. It also aims to address risks linked to drinking water pipes running close to illegal connections to the wastewater system.
The upgrade will cover around 2,271 meters of distribution pipes. Old pipes will be replaced with new PVC pipes designed to withstand pressure of up to 16 bar, while ductile iron pipes will be used in sections requiring greater mechanical strength. Measures will be taken to maintain the water supply throughout construction.
Adapting construction to the old medina
The narrow alleys and limited access for machinery in parts of the old medina require construction methods suited to the historic urban layout. Workers will carry out manual excavation where equipment cannot be used. The project also involves around 2,600 cubic meters of excavation and the installation of 120 meters of pipes using horizontal directional drilling, a technique that allows work to pass beneath sensitive areas without opening trenches along their entire length. This is intended to limit disruption to pedestrians and local businesses.
Read also : Desalination plants, dams and water transfers: What Morocco’s new govt program proposes
The project will also upgrade equipment used to regulate water pressure and monitor flow. Plans include a pressure regulator, around 20 valves and other control devices, as well as electromagnetic meters connected to remote data-transmission systems. These will help operators track water flows, identify irregularities more quickly and reduce leaks.
Before the new pipes are connected to the distribution network, they will undergo technical and health checks. The tests will include pressure testing at up to 20 bar, followed by cleaning and disinfection with chlorinated water for at least 24 hours. Final connections will only be made once bacteriological test results meet the required standards, based on analyses conducted by independent, accredited laboratories.
The work will also include restoring areas affected by construction. More than 1,600 square meters of concrete-covered walkways and 174 square meters of traditional stone paving will be repaired. Historic stones removed during excavation will be reused to help preserve the architectural character and heritage of Fez’s old medina.