In an announcement on November 7, NASA outlined a series of contracts and projects intended to accelerate the development of lunar infrastructure, transportation and communications systems. The latest measures build on a plan unveiled in March to invest approximately $20 billion over seven years in a permanent lunar settlement.
One of the projects is PROMISE, a six-wheeled rover being developed to operate in the Moon’s challenging polar environment. The vehicle is designed to investigate underground ice deposits and assess resources that could eventually support astronauts and longer-term missions.
NASA awarded Blue Origin a $94 million contract to deliver the rover to the lunar surface, with an additional $140 million option. The mission is targeted for launch in late 2028.
Water ice at the lunar South Pole is of particular interest to scientists because it could provide a source of water for future crews. If the necessary technologies are developed, lunar water could also be processed to produce oxygen and hydrogen, potentially supporting life-support systems and fuel production.
Read also : NASA discovers massive lunar crater formed by impact missed in real time
Eight companies selected for lunar missions
NASA also selected eight companies eligible to compete for future lunar delivery missions under a contract framework worth up to $10 billion.
The companies are Blue Origin, SpaceX, Firefly Aerospace, Intuitive Machines, ispace-US, Lockheed Martin, Northrop Grumman and Voyager Technologies.
The framework is intended to expand the agency’s options for transporting equipment and infrastructure to the Moon as it increases the frequency of robotic and crewed missions.
Communications infrastructure is another priority. NASA selected SpaceX to launch satellites into cislunar space in 2028. The planned network is expected to support communications between Earth, spacecraft and future operations on the lunar surface.
The agency is also developing a communications and solar tower that would combine power generation, energy storage and wireless power transfer, addressing one of the main challenges of operating equipment and habitats on the Moon.
A three-phase plan for a permanent presence
The November projects follow NASA’s March 24 announcement of a phased strategy to build a lunar base, with an estimated investment of $20 billion over seven years.
The first phase focuses on sending robotic vehicles, scientific instruments and technology demonstrations to test mobility, power generation, navigation and communications. The second involves establishing early infrastructure, including semi-habitable facilities that would allow astronauts to conduct regular operations on the surface.
The final phase would see the delivery of larger habitats, vehicles and other equipment needed to support a sustained human presence.
Read also : SpaceX targets first Starship orbital flight for September 22
NASA intends to draw on international contributions, including a pressurized rover from Japan, multi-purpose habitats from Italy and a lunar utility vehicle from Canada.
The agency has also shifted its priorities away from the original Gateway architecture, which envisaged a space station orbiting the Moon. NASA plans to pause the project in its current form and redirect applicable hardware and resources toward infrastructure on the lunar surface.
Under the updated Artemis schedule announced in March, NASA plans to use Artemis III in 2027 to test integrated systems and lunar landing operations in Earth orbit. Crewed lunar landings are planned through Artemis IV and Artemis V in 2028, followed by an initial target of one landing every six months.
The longer-term objective is to move beyond short visits and establish the infrastructure needed for astronauts to live and work on the Moon for extended periods.
