The Ministry of Equipment and Water has announced the construction of the Sidi Ammar dam in Khenifra province. With a reservoir capacity exceeding 114 million cubic meters, the project will help strengthen Morocco’s water infrastructure and address climate-related challenges.
Overseen by the ministry’s General Directorate of Water Engineering through its Water Infrastructure Directorate, the project will cost approximately MAD 450 million and will be financed entirely from the state budget.
Yassine Boughattaya, head of the Sidi Ammar dam development project, told Le360 that construction will officially begin on December 1, 2026. Located approximately 23 kilometers from the city of Khenifra, the dam will take 30 months to build, with completion scheduled for May 31, 2029.

Construction will begin with preparatory infrastructure and roadworks, including a 6.5-kilometer access road, followed by the temporary diversion of the river, excavation and foundation treatment. The final stages will involve building the dam structure, installing monitoring equipment and restoring the surrounding site.

The dam will be built using roller-compacted concrete (RCC). It will stand 56 meters above its foundation, with a crest length of 184 meters at an elevation of 842 meters above sea level. The dam structure will have a total volume of approximately 120,000 cubic meters.
The reservoir will hold 114.25 million cubic meters of water and cover 876.5 hectares. Its catchment area spans 430 square kilometers, with an average annual inflow of 45.55 million cubic meters.

According to Boughattaya, the dam will improve the regulation of flows along the Grou River and supplement water supplies to the Sidi Mohammed Ben Abdellah dam. It will also provide drinking water to neighboring villages and irrigation water to agricultural areas downstream. Construction is expected to generate approximately 150,000 person-days of employment, providing jobs and training opportunities for local workers.
New and upgraded roads will also improve access to isolated villages surrounding the project, while the reservoir is expected to create economic opportunities through ecotourism and activities around the lake.
